Con Edison

Plugged In Transmission Line With Walter Alvarado

Informações:

Sinopsis

Listen to Walter Alvarado Vice President of System and Transmission Operations share Con Edison's plan for building three new transmission lines. The project will boost the use of renewable energy in the region when it comes on line and reduce the need for old fossil fuel peaker plants.